Sonotube TubeBase® Footing Forms Installation Guide
Below grade/ground installation tips
1. Excavate hole to a depth to avoid frost penetrating under pier.
(Typically 4’ to 6’.)
2. Apply Sonotube form to TubeBase footing form.
3. Cut off excess plastic at top of wedges to desired Sonotube form size.
4. Attach Sonotube form to TubeBase footing form with a minimum of
4, 1” screws.
5. Place TubeBase footing form at desired location. (On undisturbed soil or
4”-6” of compacted crushed stone or gravel.)
6. Install footing rebar if required. (Rebar installation should be approved and
designed by a qualified engineer and meet all building code requirements.)
7. Level/plumb Sonotube form/TubeBase footing form prior to backfilling.
8. Sonotube form and TubeBase footing form combined cannot
exceed/extend 24” or more above grade/ground.
9. Have inspected by building inspector as required by different municipalities.
10. Backfill making sure Sonotube form remains level/ plumbed at desired
location.
11. Prior to pouring concrete into Sonotube form invert spare TubeBase
on top of Sonotube form to act as a funnel for concrete pour.
12. Pour concrete.
13. Install anchor bolt to accept bracket as required.
Above grade/ground installation tips
For any TubeBase footing form project which requires the combined use of a
Sonotube form and TubeBase footing form to exceed/extend 24” above ground/grade when pouring concrete, the Sonotube form MUST be braced to
prevent movement of Sonotube form while the concrete is curing. (Conventional
methods: Strapping or 2X materials w/stakes; wooden collar; frame with side
braces)
WATCH THE TUBEBASE CONCRETE FORMS DEMO VIDEO:
> TubeBase Demo.mov (Quicktime)
> TubeBase Demo.wmv (Windows Media)
*Note: movies may take several minutes to download on slower internet connections. Appropriate media players are required to view.